1 / 5
Model No. : | q345B JGJ231-2010 |
---|---|
Brand Name : | Zhongshun |
Type : | Ringlock |
Cangzhou, Hebei, China
وصف المنتج
التثبيت السريع سقالة رينجلوك مجلفنة هو تستخدم على نطاق واسع لبناء المباني ، وبناء الطرق ، والبناء المدني ، وبناء هندسة المحيطات داخل وخارج الإطار ، والدعم ، والسقالات ، الجسر والنفق ، المرحلة ، إلخ . لديه قدرة تحميل أعلى وعمر خدمة طويل.
تركيب سريع هو واحد من adevantages therer.
a. |
Easily set up and easily disassembly,so it's labour saving |
b. |
Stable and reliable,safe and efficent |
c. |
Structure simple,Very little material required |
d. |
Maintenance free ,easy to transport and always ready for use |
e. |
Economic and versatile design |
f. |
Strong commonality |
تهيمن التفاصيل
Name | Quick installation Galvanized ringlock scaffolding tower |
Technology process | robot Automatic welding and hot dipped galvanized |
Standard/Vertical post |
Q345B ∅60.3*3.2mm length:0.5/1.0/1.5/2.0/3.0m
Q345B ∅48.3*3.2mm length:0.5/1.0/1.5/2.0/3.0m |
Ledger/Transom Horizontal ledger Cross Brace |
Q235B ∅48*3.2mm length:1.0/1.3/1.5/2.0/2.3/2.5/3.0m |
Diagonal | Q195B ∅42*2.5mm |
Circle Disc | Q345B ∅133*10mm ,with 8 holes in it |
Other parts | Jack\plates\casting\steel panks\coupler |
Carrying capacity | 10-20ton |
Service life | more than 25 years |
Packing&deliver | packed with steel pallets in bundle;15-25 days after deposit |
Payment Terms | T/T 30%Depoist,L/C,DP,WU,CASH,etc. |
MOQ | 25tons |
Application | building construction , road , civil , ocean engineering , bridge , etc |
PK ومقارنة
تركيب سريع برج سقالات رينغلوك
Production |
Ringlock scaffold |
Cuplock scaffold |
PK |
|
Safety |
Material:Q345B SIZE:ODΦ60/Φ48mm WT:3.2-2.5mm Hot dipped galvanized |
& |
Material:q235B SIZE:ODΦ48mm WT:1.8-3mm easy-corrosive |
Safer and more reliable
|
Bearing capacity |
Bearing capacity:20tons |
& |
Bearing capacity:4tons |
Bigger carrying capacity |
Steel quantity |
100000 m3 of erection of steel weight of the volume of about 800 tons (housing)/about 1000 tons (Bridges) |
& |
100000 m3 of erection of steel weight of the volume of about 2500 tons |
Less steel |
Man hour |
about 500 hours for each of the 100,000 m3 to set up or disassemble |
&
|
about 1500 hours for each of the 100,000 m3 to be removed or assemble |
saving time,efficient |
Life expectancy |
With a life span of more than 30 years. |
& |
With a life span of more than 5 years. |
Long using life |
الوضعية
وتستخدم على نطاق واسع السقالات حلقة قفل لبناء المباني ، وبناء الطرق ، والبناء المدني ، وهندسة المحيطات داخل وخارج الإطار ، والدعم ، والسقالات ، الجسر والنفق ، المرحلة ، الخ
Cangzhou, Hebei, China
أرسل استفسارك إلى هذا المورد