Product information
bitumen membrane sheets 4mm bitumen waterproofing membrane Modified bitumen waterproof membrane for building construction have modified asphalt by SBS, APP or APAO, APO, on both sides have isolate materials and with the base cloth PY (polyester mat), G (fiberglass mat), NK (compound base), PYG (Glass fiber reinforced polyester mat). Upper surface isolate material: Polyethylene film (PE), Fine sand (S), mineral (M). Under the surface isolate material: Polyethylene film (PE), Fine sand (S).
Specification
bitumen membrane sheets 4mm bitumen waterproofing membrane Width: 1.0M Length: 7.5M, 10M can be customized. Thickness: 2.0mm, 3mm, 4mm, 5mm. Surface materials: Aluminum foil, PE film, Sand, Schist, Mineral, etc.
Thickness
|
2mm, 3mm,4mm,5mm
|
Surface Materials
|
PE film, sand, schist, aluminum foil, aluminum film, Mineral
|
Reinforced
|
polyester reinforced, fiberglass reinforced
|
Lower Temperature
|
0 degrees Celsius,Minus 5 degrees Celsius, Minus 10 degrees Celsius, Minus 15 Degrees Celsius, Minus 20 Degrees Celsius, Minus 25 Degrees Celsius.
|
Size
|
Width1M,Length can be 7.5M, 10M each roll
|
Datasheet
Characteristic
a) SBS bituminous roof materials is specially used as waterproof material in cold area b) APP bituminous roof materials is specially suitable for areas of high temperature and of strong sun-shine Cheap Bitumious roof materials for building construction/ bitumen roofing membrane c)Good performance in Good impermeability ,anti-puncture, anti-broker, anti-resistance, anti-erosion, anti-mildew, anti-weathering d)Possess good tensile strength, elongation rate and size stability which could be well suited the substrate distortion and crack Construction and Application There are two methods in application
Bitumen membrane sheets 4mm bitumen waterproofing membrane
a) One way is by heating and melting method.Heat the polyethylene film of the membrane and roof deck surface by heating and melting method to be nearly melted (not flowing),then install the membrane filly bonded to the roof deck with overlaps of 5-10cm.
b) The other way is by cold adhesive method.Pour the cold adhesive homogeneously on the roof deck, then roll the membrane to install it to be fully sticked to roof deck. By heating and melting method and by cold adhesive can be used in alternation in application as requested. c)After application,a full serious inspection is required to sure no air bubble,no falling away.etc. to guarantee the waterproof life.
construction:
1.The base should be dry and clean. Do not work in the rainy or snowy day. 2.Do not work under heavy wind(above 5 grade) 3.Unsuitable for construction below 5°C 4.If it is rain or snow in the process of construction, protective measure to the laid membrane is must. 5.All the workers should put on special uniforms to keep safe when installing. There should be equipments for fire controls.
Storage and Transportation:
1, Different items, models, dimensions and grades should be stored separately. 2, Put the product in a dry ventilated place with the temperature lower than 50'c and the height less than 2 layers. 3, It will not be factory if any problems caused by wrong transportation or storage or the storage years are more than a year. 4. All the rolls should be erect without any putting across or incline. Cover the canvas when necessary.
Package and shipment
Certification:
How to Contact Us